Notice to Resume Work or of Measures Satisfied – Michels Canada – Order VS-002-2025

Notice to Resume Work or of Measures Satisfied – Michels Canada – Order VS-002-2025 [PDF 208 KB]

NOTICE TO RESUME WORK OR OF MEASURES SATISFIED,
IN THE MATTER OF THE CANADIAN ENERGY REGULATOR ACT,
FOLLOWING AN ORDER UNDER SECTION 109(1)

The undersigned Canada Energy Regulator Inspection Officer hereby notifies:

Michels Canada that the hazardous or detrimental situation described in Order No. VS-002-2025 has been remedied to the satisfaction of the Inspection Officer.

Therefore,

  •     suspended work may resume, and/or
  •  X  the measures specified in the Order have been satisfied.
Inspection Officer

Inspection Officer

12 February 2026

Date

 
REDACTED
 
 
REDACTED
 

IO Designation Number

Signature

210-517 10 Ave SW, Calgary AB  T2R 0A8

CVA or incident #: INC2025-096

Date modified: